MAISON

Plug & Charge

  • How to Upgrade Existing Chargers to Support New Connectors How to Upgrade Existing Chargers to Support New Connectors
    Sep 16, 2025
    Standards evolve, vehicles change, and sites can’t stand still. The good news: many DC fast chargers can add newer connectors without starting from zero—if you line up electrical headroom, signal integrity, software, and compliance in the right order.     Industry snapshot (dated milestones that shape upgrades) SAE moved the North American connector from an idea to a documented target: a technical information report in December 2023, a Recommended Practice in 2024, and a dimensional spec for the connector and inlet in May 2025.   Major networks have publicly said they’ll offer the new connector at existing and future stations by 2025, while equipment makers shipped conversion kits for existing DC fast chargers as early as November 2023. Separately, one network reported its first pilot site with native J3400/NACS connectors in February 2025, adding a second in June 2025. Some Superchargers are open to non-Tesla EVs when the car has a J3400/NACS port or a compatible DC adapter.   What this means for you: plan for dual-connector coverage where traffic is mixed, and treat cable-and-handle swaps as the first option when your cabinet’s electrical, thermal, and protocol limits already fit the new duty.   Upgrade paths (pick the lightest that works) Cable-and-handle swap: replace the lead set with the new connector while keeping cabinet/power modules. Lead + sensor harness refresh: Add temperature sensing at the pins, tidy the HVIL circuit, and reinforce shielding/ground continuity so the data channel stays stable and thermal derating unfolds smoothly. Dual-connector add: keep CCS for incumbents and add J3400 for new traffic. Cabinet refresh: step up only if voltage/current class or cooling is the real blocker.     Retrofit flow (from idea to live energy) Map vehicles to support (voltage window, target current, cable reach). Check cabinet headroom (DC bus & contactor ratings, isolation-monitor margin, pre-charge behavior). Thermals (air vs liquid; sensor placement at the hottest elements). Signal integrity (shield continuity, clean grounds, HVIL routing). Protocols (ISO 15118 plus legacy stacks; plan contract certificates if offering Plug & Charge). CSMS & UI (connector IDs, price mapping, receipts, on-screen prompts). Compliance (labels, program rules; keep a per-stall change record). Field plan (spare kits, minutes-level swap procedures, acceptance tests, rollback).     Engineering noteHandshake stability lives inside the handle and lead as much as in firmware. Stable contact resistance, verified shield continuity, and clean grounds protect the data channel that rides on the power lines. As practical reference points, assemblies such as Workersbee high-current DC handle embed temperature sensing at hot spots and maintain continuous shield paths so current steps are smooth rather than abrupt.   Can I just swap the cable and handle? Often yes—when the cabinet’s bus window, contactors, pre-charge, cooling, shield/ground continuity, and protocol stacks already meet the new duty. Where you must keep CCS available or the cabinet wasn’t built for retrofits, use dual leads or stage conversions by bay.     Five bench checks before field work Bus & contactors: ratings meet or exceed the new connector’s voltage/current duty. Pre-charge: resistor value and timing handle the vehicle inlet capacitance without nuisance trips. Thermals: cooling path has margin; pin-temperature sensing is in the right place (near the hottest elements). Signal integrity: shield continuity and low-impedance drains end-to-end; clean grounds. Protocol stacks: ISO 15118/Plug & Charge where needed; certificate handling planned.     Retrofit readiness scorecard Dimension Why it matters Pass looks like What to check Bus & contactors Safe close/open at target duty Ratings ≥ new duty; thermal margin intact Nameplate + type tests Isolation & pre-charge Avoid nuisance trips on inrush Stable pre-charge across models Log plug-in → pre-charge separately Thermal path Predictable current steps, not hard cuts Sensors at hot spots; proven cooling path Thermal logs during soak Signal integrity Clean handshake beside high current Continuous shield & ground; low noise Continuity tests; weather-band trials Serviceability Short incidents, fast recovery Labeled spares; no special tools Swap order: handle → cable → terminal UI & CSMS Fewer support calls Clear prompts; consistent IDs & receipts Price and contract mapping tests Compliance Avoid re-inspection surprises Labels and paperwork aligned Per-stall change record   Field-proven acceptance tests Cold start: first session after overnight; log plug-in → pre-charge and pre-charge → first amp as two metrics. Wet handle: light exterior spray (no flooding); confirm clean handshake. Hot soak: After sustained operation, confirm the charger reduces current in controlled steps rather than with abrupt cutoffs. Longest lead bay: confirm voltage drop and on-screen messaging. Reseat: single unplug/replug; recovery should be quick and clean.     FAQs Can existing DC fast chargers be upgraded to new connectors?Yes in many cases—starting with a cable-and-handle swap when electrical, thermal, and protocol checks pass. Some vendors provide retrofit options; others recommend new builds for units not designed for retrofits.   Will we alienate CCS drivers if we add J3400?Keep dual connectors during the transition. Several networks have committed to adding J3400/NACS while retaining CCS.   Do we need software changes?Yes. Update connector IDs, price logic, certificate handling, and UI messages so receipts and reports stay consistent.   Is ISO 15118 required for new connectors?Not universally, but it enables contract-at-the-cable and structured power negotiation, and pairs well with J3400 rollouts.   Upgrades succeed when mechanics, firmware, and operations move together. Do the lightest change that delivers a clean start and a predictable ramp—then make that swap repeatable across bays.
    EN SAVOIR PLUS

Besoin d'aide ? laisser un message

laisser un message
SOUMETTRE

MAISON

PRODUITS

whatsApp

contact